Subcontracting
Design, Installation and Construction of Mulla Abdullah new Gas Fuel Pipes and Skids with all X-ray and Nitrogen checks.
Design, Installation and Construction of firefighting pipes for Mulla Abdullah plant – Kirkuk for GT, MBOP, EBOP, X-ray check and Flushing.
Installation DCS system for PS2 Station in Samawa.
Installation of 2MVA service transformer for West Qurna M055.
Installation of 1MVA service transformer for West Qurna M055.
Installation of (2) Step up transformer 30MVA for West Qurna M055
Ministry of Electricity Project
Resource Technology performed several projects with one of the important Customers (Ministry of Electricity) to supply the required parts, equipment’s and materials for Gas turbines outages and balance of plant.
We are lisƟng some of these projects which is contributed to maintain and sustain more than 1000 MW.
1- Supply capital parts for Frame 5 gas turbine installed at Baghdad South 2 Power Plant
2- Supply bearings and consumables for 9E’s units installed at Qudus Power Plant
3- Supply fuel oil treatment centrifugal machines for Al-Haidaria Power plant
4- Supply compressor blades for Frame 5 units installed at Mulla Abdullah PP
5- Supply Fields rotor for Brush generator installed at Al-Khairat PP
6- Supply and install upstream cooling system for 9E’s gas turbine at Qudus Power Plant
7- Supply spare parts for oil fuel treatment plant for Al-Qudus Power Plant